Buena Vista Drive Corridor

The Buena Vista Drive Corridor improvements include improved access and parking to Downtown Disney, design and construction of two parking garages totaling more than 6,000 spaces with themed façade, construction of a ramp off I-4, pedestrian bridges, themed directional signage and area development. The project incorporates roadway reconstruction and the relocation and realignment of many of the utility systems including temporary and permanent storm drain systems, potable water, re-use and sewer pipe utility systems, telecom systems, natural gas systems and primary power systems.